GARMENT PRODUCTS PROCESS & EQUIPMENT SOLUTION (3)

15  Button Attaching Machine & Snap Attaching Machine

a. Button Attaching Machine

图片1

JK1903ASS Electric button attaching machine
JK1903ASS     Electric button attaching machine
JK1377 Button attaching machine
JK1377     Button attaching machine
JK373 Button attaching machine
JK373     Button attaching machine

b. Snap Attaching Machine

JK808 Snap attaching machine
JK808     Snap attaching machine
JK-Q1 1 puncher pneumatic snap attaching machine
JK-Q1     1 puncher pneumatic snap attaching machine

 

16  Group Inspection

This is “In-process Inspection”. Each group has an inspector who is responsible for checking cloth quality. When problems occur, those inspectors need to assure that problems can be solved directly.

图片7

HD-1200C Computer-control type needle detector
HD-1200C     Computer-control type needle detector

 

17  Thread Trimmer Machine & Thread Suck Machine

Here is “Thread Suck Machine”. After threads have been trimmed, cloth will be sent to this machine to blow away threads.

图片9_副本

T22C Thread trimmer machine
T22C     Thread trimmer machine
JK560-A Thread suck machine
JK560-A     Thread suck machine

 

18  Ironing Equipment

Until last procedure, cloth has transferred into garment. But it is not the final step. After going through so many procedures, garment is already wrinkled. So, here comes next step: Ironing. In order to meet customers’ demands, garment need to be pressed carefully and measured as well.

This is “The tail workshop”.

图片12 图片13

TDZ-82*122A Piano type electric heating air suction ironing table
TDZ-82*122A     Piano type electric heating air suction ironing table
TDZ-Q3 Piano type air suction ironing table
TDZ-Q3     Piano type air suction ironing table
JK-9000 Electric steam bolier with seam iron
JK-9000     Electric steam bolier with seam iron
JK-460 Spot eliminator
JK-460     Spot eliminator

 

19  Hanging Swing Ticket

This is one part of “Packaging Workshop”—hanging swing ticket, sticking certification etc. Only if quality can be guaranteed, garment can be sent to this workshop. All problems need to be solved during this procedure.

图片18

 

20  Packing

These are “garment in packages”. Then, garment can be shipped after packing them up.

图片19

21  Finishing

At last, through the joint efforts of many people, garment come to the market.

图片20

 

Above steps are main parts of Garment Production Procedures. Hope it can help you to learn more about Garment Production and Equipment Solution. If you are interested in clothing equipments, welcome to contact us!

 

2 thoughts on “GARMENT PRODUCTS PROCESS & EQUIPMENT SOLUTION (3)”

Leave a Reply

Your email address will not be published.